- Cost-plus contract
- The client pays the actual cost of the work plus a builder's fee. Open-book by design — invoices and subcontracts are visible — which puts cost risk on the owner and rewards a builder who buys well rather than one who padded the bid.
- Fixed-price (stipulated sum) contract
- One lump sum for a defined scope. Simple for the owner and standard in production building, but on a custom home it forces the builder to carry contingency inside the number, and any drawing gap becomes a change order.
- GMP (guaranteed maximum price)
- A hybrid: cost-plus accounting with a ceiling the builder cannot exceed for the agreed scope. Savings below the cap may be shared or returned. It requires complete drawings and a real preconstruction phase to price honestly.
- Builder's fee
- The builder's compensation on a cost-plus or GMP job, quoted as a percentage of cost or as a fixed dollar amount. A fixed fee removes the incentive to let costs grow; a percentage fee is simpler but rises with every upgrade.
- Allowance
- A budgeted dollar placeholder for a category not yet selected — plumbing fixtures, appliances, flooring, lighting. It lets a contract be signed before every decision is made, and it is where most budget surprises originate.
- Allowance overrun
- The difference when the actual selection costs more than the allowance carried. Thin or optimistic allowances are the classic way a low contract price becomes an expensive house.
- Selections
- Every product, finish and fixture the owner chooses, tracked on a schedule with deadlines tied to construction sequence. Late selections stop work more often than material shortages do.
- Change order
- A written, priced and signed amendment adding, removing or altering scope, with its schedule impact stated. Verbal changes are the most common source of end-of-job disputes on custom homes.
- Draw schedule
- The milestone-based sequence in which a construction lender releases funds — typically after an inspection confirms the stage is complete. Draws lag the work, so builders and trades finance each phase in the interim.
- Construction-to-permanent / one-time close
- A single loan that funds construction, then converts to a mortgage without a second closing. It saves one set of closing costs and locks the permanent terms early, but it fixes the rate before the house exists.
- Interest reserve
- Money built into the construction loan to pay interest during the build, since the owner is carrying the loan on a house nobody lives in yet. A longer build burns more reserve; when it runs out, payments come out of pocket.
- Appraisal gap
- When a custom home appraises below its cost to build, because a bespoke house on an unusual lot has few comparable sales. The owner covers the difference in cash, which is why lenders scrutinize custom appraisals hardest.
- Owner-builder
- The owner acts as their own general contractor, hiring and scheduling trades directly. It can remove the builder's fee, but it moves lien risk, warranty, insurance, scheduling and lender qualification onto someone doing it once.
- Lot fit study
- A pre-purchase or pre-design test of whether a specific house program will actually fit a specific lot after setbacks, easements, cover limits, trees, slope and driveway access. Cheap insurance against buying unbuildable land.
- Site cost
- Everything spent before the house starts — clearing, excavation, retaining, driveway, utility runs, septic or sewer tap, water service, drainage. On steep or rocky Hill Country lots it can rival the cost of a wing of the house.
- Geotechnical report and pier design
- A soils investigation that determines bearing capacity, expansive-clay potential and depth to rock, driving the foundation design — slab-on-grade, pier and beam, or drilled piers. Skipping it is the most expensive economy in residential construction.
- Rock excavation
- Breaking limestone with hammers, saws or rippers where a trencher or excavator cannot cut. Common across the Hill Country, priced by the cubic yard or by the hour, and one of the few line items no amount of design can fully predict.
- OSSF (on-site sewage facility)
- The regulated term for a septic system. In Texas the design must be prepared by a licensed professional and permitted by the county or an authorized agent under TCEQ rules, with soil evaluation determining the system type and the drain field area required.
- Well versus municipal water
- Rural lots may need a drilled well with its own pump, storage and treatment, or service from a municipal utility or water supply corporation with a tap fee and possibly a waiting list. Neither the cost nor the availability should be assumed before closing on land.
- Edwards Aquifer Recharge Zone
- A regulated area over Central Texas where construction requires an approved water pollution abatement plan and specific stormwater controls, adding review time and cost to sites that sit above it.
- LCRA watershed rules
- Lower Colorado River Authority requirements governing development in the Highland Lakes watershed — wastewater, water quality and on-site sewage standards on lots near Lake Travis and the other Highland Lakes.
- Impact fee
- A one-time municipal charge on new connections to fund water and wastewater capacity. It is paid at permit or connection, varies by service area, and is easy to leave out of an early budget.
- Plat and replat
- The recorded legal division of land into lots. Building on an unplatted tract, or reconfiguring lot lines, requires a platting process that can add months before a permit is possible.
- Setback
- The minimum required distance from a structure to a property line, easement or right of way. Front, side and rear setbacks combine with cover limits to define the actual buildable footprint of a lot.
- Impervious cover limit
- The maximum share of a lot that may be covered by surfaces water cannot pass through — roof, drives, patios, walks. In Austin the cap is set by zoning district and watershed, and on small lots it, not the setbacks, is usually what limits the house.
- Heritage and protected trees (Austin)
- Austin protects trees at 19 inches or greater in trunk diameter, and designates trees of 24 inches or greater in specified species as heritage trees with far stricter removal rules. A single heritage oak can relocate a house on its lot.
- Subchapter F / 'McMansion' ordinance
- Austin's residential design and compatibility standards, adopted in 2006 for central-city single-family areas. It caps floor-to-area ratio and forces the house inside a sloping 'tent' envelope measured from the setback lines, shaping roof form and second floors.
- ADU (accessory dwelling unit)
- A secondary dwelling on a single-family lot — garage apartment, casita or detached cottage. Rules on size, height, parking, owner occupancy and how the unit counts against cover determine whether one pencils.
- Austin Energy Green Building rating
- Austin Energy's residential green building program, which rates homes on a one-to-five-star scale across energy, water, materials, health and community. Participation is required for new single-family homes in the Austin Energy service area.
- Blower door test
- A calibrated fan depressurizes the house to measure air leakage, reported as air changes per hour at 50 pascals. Energy codes set a maximum, and the test is a pass/fail gate at inspection, not an optional upgrade.
- HERS index
- The RESNET Home Energy Rating System score. A reference home built to the 2006 energy code scores 100 and a net-zero home scores 0, so a lower number is better. Rating requires a certified rater and on-site testing.
- Spray foam and the unvented attic
- Foaming the roof deck brings the attic and the ductwork inside the conditioned envelope, a common high-performance strategy in hot-humid climates. It changes moisture and combustion-air behavior, so it has to be designed as an assembly, not bought as a product.
- Manual J load calculation and TABB commissioning
- Manual J is the ACCA room-by-room heating and cooling load calculation that determines correct equipment size; rule-of-thumb tonnage produces oversized systems that short-cycle and never dehumidify, the most common comfort complaint in a new house. TABB certification covers the technicians who test and balance the installed system — airflow, duct leakage and ventilation rates — because installed HVAC performance routinely diverges from design.
- Structural warranty
- Insurance-backed coverage on load-bearing elements, commonly for ten years, separate from the builder's own workmanship warranty. It survives the builder going out of business, which is precisely why buyers ask about it.
- RCLA (Texas Residential Construction Liability Act)
- Chapter 27 of the Texas Property Code. Before suing over a construction defect an owner must give the contractor written notice of the complaint and a chance to inspect and offer repair, with statutory waiting periods. It is a mandatory notice-and-opportunity-to-repair process, not optional dispute etiquette.
- Mechanic's lien and lien affidavit
- A Texas contractor, subcontractor or supplier can secure payment by filing a lien affidavit against the property within statutory deadlines tied to when the debt accrued, with residential projects on a shorter clock than commercial. Missing the deadline forfeits the lien.
- Retainage
- A percentage of each payment withheld until completion as security for finishing the work. Texas law imposes specific retainage requirements on residential construction, and mishandled retainage is a frequent source of lien claims.
- Substantial completion
- The point at which the house can be occupied for its intended use even if minor items remain. It typically starts warranty periods, shifts insurance and risk of loss, and triggers final payment terms.
- Punch list
- The itemized list of incomplete or defective work identified at the walkthrough before final payment. A short punch list is a supervision result, not a luck result.
- One-year warranty walk
- A scheduled return visit near the first anniversary to address settlement cracks, door and drawer adjustments, grout and caulk, and seasonal movement. Builders who calendar it rather than wait for a complaint keep referral pipelines alive.
- Price per square foot
- Total cost divided by area — a comparison that breaks the moment two houses differ in site work, ceiling height, glazing, roof complexity or finish level. Useful only against a builder's own past projects of similar specification, never across builders.
- Conditioned versus total square footage
- Conditioned area is heated and cooled living space; total includes garages, porches and covered outdoor rooms. Quoting a cost using one number and an area using the other is the oldest arithmetic in the industry.
- Plan-to-permit timeline
- Elapsed time from finished construction documents through review, corrections and issued permit. In a constrained jurisdiction it is measured in months, runs in parallel with nothing, and is the phase clients most consistently underestimate.
- Superintendent ratio
- How many active jobs one field superintendent is running. It is the single most predictive quality and schedule metric a client can ask about, and almost no builder volunteers it.
- Trade partner scheduling
- Sequencing subcontractors so each arrives to work that is genuinely ready. Custom homes have no repeatable plan to schedule against, so the superintendent rebuilds the sequence on every job.
- Long-lead items
- Products with order-to-delivery times long enough to drive the schedule rather than follow it — windows, steel, custom cabinetry, specialty appliances, elevators, certain roofing and stone. They must be selected and released early, often before the client feels ready.
- Value engineering
- Revising design and specification to hit a budget without gutting intent — simplifying roof geometry, adjusting glazing, resizing the footprint. Done during design it saves real money; done after permit it mostly generates redraw fees.
- Preconstruction and conceptual estimating
- The paid phase where a builder prices a design as it develops, tests alternates and produces a budget the client can act on before construction documents are finished. It is the main reason to hire a builder early rather than bid a finished set.